What South Carolina still offers after the federal credit ended
Every incentive on this page is verified against South Carolina government sources - and the expired ones salespeople still quote are called out.
The 30% federal solar tax credit ended for installations finished after December 31, 2025 - Mount Pleasant systems completed in 2026 get $0 from it.
Under South Carolina's export rules, compensation for surplus power decides the payback - which typically runs 10-14 years on unsubsidized 2026 math.
Installed home solar for Mount Pleasant homeowners averages about $2.58 a watt across the U.S. marketplace - roughly $30,960 for a 12 kW system before incentives.
The federal Residential Clean Energy Credit - the 30% one every solar ad still quotes - was repealed by the One Big Beautiful Bill Act signed July 4, 2025. Per the IRS, it is not available for any system placed in service after December 31, 2025, and 'placed in service' means the installation completion date, not the contract date.
If a salesperson in Mount Pleasant tells you a 30% federal tax credit applies to your 2026 installation, they are quoting a dead law. What may still exist: South Carolina's own incentives and tax treatment, listed below, and lease/PPA arrangements where a company claims commercial credits - in which case the credit belongs to them, not you.




The 2026 numbers
| System size | Installed price (marketplace avg) | Notes |
|---|---|---|
| 6 kW | $15,480 | Small roof / low usage |
| 8 kW | $20,640 | Typical starter system |
| 10 kW | $25,800 | Family home with AC |
| 12 kW | $30,960 | Large home / EV charging |
| Home battery (optional) | $12,000-$16,000 | Backup power + self-consumption |
Get solar quotes for Mount Pleasant
These platforms collect bids from licensed installers so you can compare against the same spec. Prices come from installers, not from this site.
Disclosure: this is an independent guide. If you request quotes through a link here, the platform may pay this site a referral fee. That fee never changes your quotes.
South Carolina rules that decide your payback
| Rule | South Carolina status |
|---|---|
| Export compensation (net metering) | Not full retail for new customers — the 1:1 Renewable Net Metering rider (Rider RNM) closed to new participants on June 1, 2021, and new residential solar now takes Solar Choice Metering (Rider RSC, served on a solar time-of-use schedule), while the last full-retail legacy class (applications before May 16, 2019) reached its sunset on December 31, 2025 and moves to Rider NMT or Rider RSC. |
| State incentive | Solar Energy, Small Hydropower System, or Geothermal Machinery and Equipment Credit (S.C. Code Ann. Section 12-6-3587) — 25% of purchase and installation cost, capped at $3,500 per facility or 50% of tax liability per year, whichever is less, with a 10-year carryforward |
| Sales tax on the system | Not exempt - taxed like any purchase |
| Property tax on added home value | Excluded |
South Carolina still has a live 25% state income tax credit — genuinely unusual for this region — but the old full-retail net metering grandfather class expired on December 31, 2025, so a 2026 install earns markedly less for exports than a 2019 install did. Note also that the South Carolina property tax exemption is capped at 20 kW AC: systems above that size do not qualify, though attached battery storage is included within the exemption.
This guide is research, not advice: an independent summary of published prices and state rules. It is not an installer, lender or tax advisor - verify incentive eligibility with a licensed tax professional before relying on it.

What this means for Mount Pleasant roofs
The honest 2026 answer for Mount Pleasant: solar pays back slower without the 30% credit - paybacks that ran 7-10 years often now run 10-14 - but electricity rates keep rising and hardware is the cheapest it has ever been. The deciding factor is South Carolina's export compensation, covered in the net metering section.
This guide is research, not advice: an independent summary of published prices and state rules. It is not an installer, lender or tax advisor - verify incentive eligibility with a licensed tax professional before relying on it.
Getting Mount Pleasant quotes
The spread between the highest and lowest bid for the same roof routinely hits 30-50%, because solar quotes carry very different sales overheads. Two or three independent bids collected against the same system size is the single highest-value hour in the whole project.
This guide is research, not advice: an independent summary of published prices and state rules. It is not an installer, lender or tax advisor - verify incentive eligibility with a licensed tax professional before relying on it.
Common questions
Do I need a battery with my solar?
Not necessarily. Under full retail net metering, the grid effectively stores your surplus for free. Batteries earn their $12,000-16,000 price where export rates are low, outages are common, or time-of-use rates make evening self-consumption valuable.
Does solar raise my property taxes?
It depends on the state - many exempt solar's added home value from property tax, others do not, and some exemptions have expiration dates. This guide's state page lists the verified rule and source for your state.
Is my roof even suitable for solar?
Three things decide it: orientation (south-facing is best in the U.S., east-west workable), shade (trees or taller buildings across midday hours can sink the math), and roof age (if the shingles have under 10 years left, reroof first - removing and reinstalling panels later costs thousands). Any honest installer assesses all three before quoting a number.
How do I check if a solar quote is fair?
Divide the total price by the system's wattage. The U.S. marketplace average is about $2.58 per watt installed; $2.30-3.00 covers most fair quotes depending on roof complexity. Above that, ask exactly what you are paying extra for - in writing.
How long do solar panels actually last?
Panels are typically warrantied for 25 years of production and commonly outlive it, losing about 0.5% output per year. Inverters are the component that usually needs replacement - typically once, around year 12-15, at a few thousand dollars.
Get solar quotes for Mount Pleasant
These platforms collect bids from licensed installers so you can compare against the same spec. Prices come from installers, not from this site.
Disclosure: this is an independent guide. If you request quotes through a link here, the platform may pay this site a referral fee. That fee never changes your quotes.